The road lies in two states, meanly the Khartoum State and the River Nile linking between Khartoum and Atbara through Shendi with a total length of 301 km. The road consisted of two parts. The first Lot is Elgaili-Shendi link which is about 130 km implemented and opened for operation by 2007. While the second lot is Shendi- Atbara link approximately 170 km
Section operated since the early nineteen’s of the last century. The selected design speed for this road was 100km/hr. The speed limit for the most sections is 100 km/hr. The overall objective of this study components is to contribute positively to reduction and prevention of the risk of accidents occurring on the national roadway Khartoum – Atbara and to minimize their severity. While the detailed objectives include
Client Name |
Road Safety Auditing Study for Khartoum –Elgaili - Shendi |
Client Company |
Atbara – Road Project |
Project Start Date |
2021-10-02 |
Project End Date |
2021-10-28 |
Project Cost |
$- |
Project Website |
- |